Nypro

  • Three_Silos

  • CloseUp_of_Bay

Location:

Mebane, NC

Project Delivery:

Design/Build

Value:

$2.6 M (Clean Rooms)
$3.9 M (Warehouse/Offi ce)

Size:

20,000 sf (Clean Rooms)
108,000 sf (Warehouse/Offi ce)

Project Schedule:

60 Days (Both Schedules)

Architect:

Warren Architecture
(now Triad Design Group)

Clean Room & Warehouse/Office Facility

  • Plastic injection mold plant for a Samet repeat client.
  • The facility is located in Samet’s North Carolina Industrial Center.
  • Samet completed the clean room twenty days ahead of schedule.
  • Load bearing Tilt-Up concrete exterior and mechanically attached TPO membrane roof.

Download PDF

Related Projects

  • Alcan Packaging

  • American Premium Beverage

  • Becton Dickinson

  • Brayton International

  • Cambro Manufacturing

  • Columbiana Hi-Tech

  • Creative Snacks

  • FFF Enterprises

  • Kidde Safety

  • Mannington Mills

  • Marconi Commerce Systems

  • Nypro

  • Richard Childress Racing

  • Shalag Nonwovens

  • Sheetz Distribution Center

  • Timken

  • TriVantage

  • Universal Furniture International

  • WS Badcock Corporation